Miami-Dade County
Owner’s representative for Miami Beach homes and condos
Miami Beach projects go through design review, historic districts, flood standards and island logistics. We manage the approvals, the contractor and the payments for you, on anything from a Sunset Islands rebuild to an Art Deco renovation in South Beach.
Miami BeachBuilding in Miami Beach
Building in Miami Beach
Depending on location and scope, a project can go before the Design Review Board, the Historic Preservation Board, the Planning Board or the Board of Adjustment. The city has many local historic districts, from the Art Deco core on Ocean Drive and Collins Avenue to Flamingo Park, Espanola Way and districts in Mid- and North Beach. Older, architecturally significant single-family homes can face added review before demolition. Board applications include drawings, renderings, a narrative, neighbor notice and a public hearing.
Much of the city is in FEMA flood zones, and Miami Beach requires finished floors above base flood elevation plus freeboard. The city sets minimum seawall elevations and has raised streets in some neighborhoods, which affects driveways and drainage. A renovation past FEMA’s substantial-improvement threshold can require full flood compliance.
Miami Beach is in the High-Velocity Hurricane Zone, so exterior products need NOAs. Oceanfront work seaward of the Coastal Construction Control Line needs a state coastal permit. Island access, limited staging and parking add cost. Condo owners also need association approval on work hours, elevators, insurance and alterations before a permit is filed.
Why owners here hire us
Typical work
Projects we manage in Miami Beach
Owner’s Representation
A construction manager who works for you, from first budget to handover.
Learn more PlanPermits, Board & City Approvals
Building permits, design review boards, HOA and condo approvals, start to finish.
Learn more HireContractor Selection & Bid Leveling
Vetted contractors, one bid package and a line-by-line comparison of the bids.
Learn more BuildCost Control, Pay Applications & Change Orders
Every pay app checked against work on site, every change order negotiated.
Learn more RescueProject Recovery
A 72-hour audit of a stalled or over-budget build and a plan to finish.
Learn more RescueRemote & Out-of-State Owner Representation
We represent you on site in South Florida while you live elsewhere.
Learn moreWill my project go before the Design Review Board or the Historic Preservation Board?
It depends on location, scope and any waivers or variances. Many projects in historic districts go to the HPB, many outside go to the DRB, and some are approved by staff. We confirm the path with your architect at the start.
How does flood elevation affect my renovation?
If the work crosses FEMA’s substantial-improvement threshold, the home may need to meet current flood rules, which can mean elevating or rebuilding. We check that during feasibility.
Do I need to raise my seawall?
Miami Beach has minimum elevations for new and substantially repaired seawalls. Your engineer confirms what applies, and we schedule the seawall with the house.
Can you manage a condo unit renovation?
Yes. We handle association approvals, contractor insurance, elevator and work-hour rules and the city permit, then manage the contractor to completion.
Start a project
Planning a Miami Beach project?
Call (570) 339-7793 or book a consultation. We’ll review your property, the likely board path and your budget.
- A 30-minute call with Osher about your project
- An honest opinion, even if you decide not to hire us
- A written proposal: flat monthly retainer or a percentage of construction value